this post was submitted on 01 Aug 2023
1618 points (98.2% liked)

Technology

56036 readers
6029 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 33 points 11 months ago (16 children)

14 years and 35 billion (combined with #4 which has not been finished) and didn't generate a single kWh in anger until now. Put the same investment into renewables and it would generate similar or greater energy and would start doing so within a year.

The argument against nuclear now is not about safety. It is about money. Nuclear simply cannot compete without massive subsidies.

[–] problembasedperson 36 points 11 months ago (2 children)

Renewables and nuclear are in the same team. It's true that nuclear requires a greater investment of money and time but the returns are greater than renewables. I recommend checking this video about the economics of nuclear energy.

[–] paintbucketholder 23 points 11 months ago (3 children)

That video completely ignores decommissioning costs for nuclear power plants and long-term nuclear waste storage costs in its calculation. Only in the levelized cost of electricity comparison does it show that nuclear is by far the most expensive way of generating electricity, and that it simply can't compete with renewables on cost.

People love to look at nuclear power plants that are up and running and calculate electricity generation costs based just on operating costs - while ignoring construction costs, decommissioning costs, and waste disposal costs.

[–] icydefiance 1 points 11 months ago (2 children)

The cost of storing nuclear waste for a running plant is only a few hundred thousand a year; basically just just salary for a few people to transport it to a big hole in the ground.

Decommissioning costs a few hundred million, which sounds like a lot, but for a project that lasts for decades it's basically nothing.

[–] [email protected] 8 points 11 months ago (2 children)

You could probably fit all of the nuclear waste America produces in few trucks. It's not as much as people think.

[–] grue 3 points 11 months ago

Or even less if we -- gasp, shock, horror! -- reprocessed it.

(We don't do that because of overblown fears about nuclear weapons proliferation.)

[–] [email protected] 1 points 11 months ago* (last edited 11 months ago) (2 children)

The Department estimates that continued operation of the current fleet of nuclear power reactors could ~70,000 metric tons of uranium * increase the total inventory of spent fuel from 70,000 metric tons of uranium to 140,000 metric tons of uranium. Nearly all of this spent fuel is being stored at the reactor sites where it was generated, either submerged in pools of water (wet storage) or in shielded casks (dry storage). The Dept of Energy

Those must be some big fucking trucks. And as far as I know, only Finland has actually developed any long-term storage which could be considered safe.

Nuclear is fine, but nuclear fanboi takes are similar to weed fanbois, it's not a perfect solution.

load more comments (2 replies)
[–] [email protected] 4 points 11 months ago* (last edited 11 months ago) (2 children)

Estimated total cost of decommissioning in the UK is £120bn. But it's going to take 100 years to do it.. so yay lots of rotting radioactive buildings for the next century.

The nuclear waste storage facility cost 53bn to build, let alone run.. so way off your 'few hundred thousand a year'.

load more comments (2 replies)
load more comments (2 replies)
[–] [email protected] 9 points 11 months ago

Here is an alternative Piped link(s): https://piped.video/UC_BCz0pzMw

Piped is a privacy-respecting open-source alternative frontend to YouTube.

I'm open-source, check me out at GitHub.

[–] [email protected] 30 points 11 months ago (1 children)

Renewables and nuclear play different sports.

Renewables are better for most of our needs but there is a backbone need of base power. Nuclear is an expensive but clean way to provide that.

[–] [email protected] 8 points 11 months ago (5 children)

By my very very very rough calculations, you could build a large scale solar farm with 3x power output and have enough money left over to build a 33GWh battery. That would more than cover a continuous supply of 1GW.

[–] [email protected] 12 points 11 months ago (1 children)

Absolutely, and we should. We should have both. Nuclear has a very long lifespan and very consistent power. Ideal battery setups do to buy long term lithium battery storage is less of a thing, but it's growing. There are some other battery techs that use other chemistries which are also attractive.

Multiple eggs in multiple baskets.

[–] [email protected] 2 points 11 months ago

Not the guy you responded to but I totally agree. Plus I think countries like Canada, with lots of snow and less direct sunlight, would appreciate an energy source they can rely on in the winter

[–] [email protected] 6 points 11 months ago

Unless there are a few cloudy days in a row... My panels produce a lot less than normal during cloudy days.

[–] UnPassive 5 points 11 months ago (1 children)

Remember that blanketing the world with solar panels isn't exactly great for the environment. Rooftops makes a lot of sense, but the cost goes way up, an maintenance becomes a nightmare. The footprint of nuclear is much smaller

[–] [email protected] 3 points 11 months ago (5 children)

The footprint of solar is significant, but still nothing compared to agriculture. E.g. The area used to grow corn to make ethanol in the US is ~ 3x what you'd need to fully power the US on solar.

~96000000 acres used for corn, ~40% of that is used for ethanol. That makes 38.3e6 acres. First estimate I found for area of solar panels to fully power the US on solar alone was 14.08e6. That makes corn for ethanol 2.7 times the area of solar panels if all that was used was solar.

load more comments (5 replies)
load more comments (2 replies)
[–] Waryle 26 points 11 months ago (2 children)

France was able to output 2 reactors per year at 1,5 billion of euros per 1000MW for more than 2 decades during the 70's to 90's. The whole French nuclear industry has cost around 130-150 billions between 1960 and 2010, including researches, build and maintenance of France's whole nuclear fleet.

A 1000MW reactor, at current French electricity price and for a 80% capacity factor, generates 1,4 billion of euros worth of electricity per year, for a minimum of 60 years.

Nuclear is not costly, and can absolutely compete by itself, if you don't sabotage it and plan it right.

[–] schroedingershat 4 points 11 months ago (4 children)

Except those reactors are off 30-50% of the time due to shoddy construction, €1.5/W in 2023 money is pure fiction, and overnight costs with free capital aren't real costs once you adjust for inflation and stop cherry picking the first reactors before negative learning rates kicked in.

load more comments (4 replies)
[–] [email protected] 1 points 11 months ago (2 children)

I would be very interested to know why the trend has moved away from building reactors in time and within a reasonable budget. It seems that most projects after the turn of the millennium haven't been cost effective.

Why did we manage to build reactors well before but not now?

[–] Waryle 1 points 11 months ago (1 children)

Chernobyl and Fukushima. These two events, which between them account for a few thousand deaths at most (compared with the tens of thousands of deaths caused by coal in Europe alone, for example), triggered a panic fear of nuclear power.

For decades, the nuclear industry has been abandoned and sabotaged, with projects such as Phénix, Superphénix and Astrid in France, and virtually all new reactor projects, cancelled due to anti-nuclear opposition.

Competent nuclear engineers and technicians have retired without being able to pass on their know-how, and cutting-edge nuclear-related industries have disappeared or been converted.

We can also thank the Germans for sabotaging the EPR. We started the project together, they forced us to add a lot of totally unjustified redundancies and safety features that made the prototype very complex and therefore costly to build, and then they slammed the door on us.

[–] [email protected] 2 points 11 months ago (1 children)

Competent nuclear engineers and technicians have retired without being able to pass on their know-how, and cutting-edge nuclear-related industries have disappeared or been converted.

This same fear has been enough to fund SLS and Ariane programs. Basically to avoid the loss of a capability in case it's needed later on. For some reason it doesn't seem to apply to nuclear. And now people are complaining that building new reactors is expensive, arguably at least partially due to the supply chains no longer existing in the same scale as before.

[–] schroedingershat 1 points 11 months ago* (last edited 11 months ago) (2 children)

If loss of expertise were the cause, then there would have been a cost minimum in the late 80s when the maximum number of engineers had 5-15 years of experience.

Instead costs rose for each new reactor (including repeat builds of each model).

This theory has no explanatory power over reality and predicts the opposite of what happened.

load more comments (2 replies)
[–] schroedingershat 1 points 11 months ago

Every year a reactor operates is a year of experiencing new ways they suck. The fixes and added complexities are rolled into the next reactor.

Thr grifters running the show also learn new ways to grift, so the small new delays and costs are amplified.

For older reactors the costs this imposes are rolled into operational budgets (and more often than not reactors are closed as unprofitable and the public or ratepayers are left holding the bag).

Additionally regulatory agencies keep finding new instances of fraud, stopping these adds costs to the regulator and regulatee.

This has happened since well before three mile island, so all misdirections to "scare mongering about meltdowns" are lies (the rate of cost escalation actually slowed significantly after three mile island).

[–] PetDinosaurs 17 points 11 months ago (1 children)

Base load my friend. We also need steady, reliable, clean power when it's dark and calm. Until we can accomplish seasonal grid storage of renewables, this is the less expensive option.

[–] [email protected] 6 points 11 months ago (6 children)

There are plenty of firming options (battery, pumped hydro, flywheels etc) which deliver reliability for a fraction of the price of this boondoggle. Not to mention a diverse portfolio of renewable technologies spread over a large geographical area is actually quite stable. When the sun isn't shining in one area, the wind may be blowing or the sun shining in another area.

[–] kameecoding 2 points 11 months ago
  • pumped hydro -> not exactly something that can be built anywhere and also not very cheap
  • battery -> huge environmental impact until we can get something like sodium based batteries
  • Flywheels, not exactly something that gets you through the night is it.
load more comments (5 replies)
[–] tara 13 points 11 months ago (5 children)

There’s also a reliability element too. Nuclear can reliably output a given amount of energy, at the cost of being slow to alter. Many renewable sources have sporadic amounts of power throughout each day. Either is better than fossil fuels at least.

[–] [email protected] 6 points 11 months ago (1 children)

Good point but that is not insurmountable. There are many ways to achieve predictability (batteries, hydro, tidal) that also come on stream much quicker than any nuclear plant.

load more comments (1 replies)
load more comments (4 replies)
[–] [email protected] 2 points 11 months ago (2 children)

The issue is that right now renewables energy don't reduce CO2 emissions by much. (Except for hydro)

Sure if we look at the energy produced it's very clean. The issue is intermittence. As a society we decided to continue using electrical equipment even when the sun is not shining and the wind is not blowing. So we use fossil fuel to compensate and overall the electricity production still enjoy a lot of CO2. We could use batteries, but utility scale battery are not very developed yet.

Same issue with the price. Sure solar energy is very cheap, when it's sunny. But what if I want to turn on the light at night ? The solar panel are not producing, the wind is not blowing, price is irrelevant if I can't get power when I need it.

Nuclear can produce a reliable amount of energy all the time.

I hope we will see the development of utility scale energy storage because this is what we really need for the development of renewable energy.

[–] LouNeko 10 points 11 months ago (7 children)

We don't necessarily have to use batteries. In mountainous regions we already have stations that use surplus power to pump water up a mountain and then drop it down to generate energy when needed. Its basically a potential energy battery. But this is usually location limited and more expensive to set up.

[–] [email protected] 7 points 11 months ago

Yes, Pump Storage Hydroelectricity is a great option for storage. It's not the most efficient but it allows to store massive amount of energy.

I think today it's the main utility scale storage solution in the world.

[–] [email protected] 3 points 11 months ago

There's also compressed air and flywheels for energy storage.

load more comments (5 replies)
[–] paintbucketholder 4 points 11 months ago

The issue is intermittence. As a society we decided to continue using electrical equipment even when the sun is not shining and the wind is not blowing.

And a lot of that can simply be solved with a larger grid.

Yes, in a small geographic area, you might run into a situation where the sun isn't shining and the wind isn't blowing. On the other hand, on a global scale, the sun is always shining and the wind is always blowing.

A realistic solution right now are therefore continent-wide grids that combine hydro, solar, wind and pumped hydro storage.

[–] [email protected] 1 points 11 months ago

Yea you're right.

People make stupid arguments about base load (nuclear doesn't match supply demand so it's meaningless argument) or renewables only being built out for maximum output = highest demand (in reality you need to build minimum output as a function of highest demand. Highest total power will far exceed highest demand and still be cheaper than fossil or nuclear. But people can't grasp that).

Finally. Huge interconnectors like what China and Europe are doing/ done never come up.

It's just the same old. We built 10% of renewables we need yet we are still using gas. Proof renewables don't work!

load more comments (9 replies)