Lemmy.World

168,866 readers
6,614 users here now

The World's Internet Frontpage Lemmy.World is a general-purpose Lemmy instance of various topics, for the entire world to use.

Be polite and follow the rules ⚖ https://legal.lemmy.world/tos

Get started

See the Getting Started Guide

Donations 💗

If you would like to make a donation to support the cost of running this platform, please do so at the following donation URLs.

If you can, please use / switch to Ko-Fi, it has the lowest fees for us

Ko-Fi (Donate)

Bunq (Donate)

Open Collective backers and sponsors

Patreon

Liberapay patrons

GitHub Sponsors

Join the team 😎

Check out our team page to join

Questions / Issues

More Lemmy.World

Follow us for server news 🐘

Mastodon Follow

Chat 🗨

Discord

Matrix

Alternative UIs

Monitoring / Stats 🌐

Service Status 🔥

https://status.lemmy.world

Mozilla HTTP Observatory Grade

Lemmy.World is part of the FediHosting Foundation

founded 1 year ago
ADMINS
1
 
 

Polish article

From https://lemmy.world/post/9227800

Train manufacturer intentionally bricks trains serviced by independent service providers

Polish train manufacturer that lost servicing tender programmed train controller to brick itself after train stays for some time in 6 ISP facilities or in 1 their faculity(for testing?) until undocumented button combination is pressed. Some controller versions brick itself after train is idle for 10 days. After news about this became public, manufacturer removed ability to unlock train by button combination.

Also manufacturer is able to remotely brick train over internet(connected via GSM) at any time.

2
 
 

A polish hacker found out why trains did stop working. The manufacterer implemented a hidden electronic switch, which automatically activated after trains were serviced by a different company.

3
 
 

Polish train manufacturer that lost servicing tender programmed train controller to brick itself after train stays for some time in 6 ISP facilities or in 1 their faculity(for testing?) until undocumented button combination is pressed. Some controller versions brick itself after train is idle for 10 days. After news about this became public, manufacturer removed ability to unlock train by button combination.

Also manufacturer is able to remotely brick train over internet(connected via GSM) at any time.

Full versions: Polish(original), Russian

4
 
 

A Mastodon thread by @q3k, who, together with @redford and @mrtick have reverse engineered the PLC code of NEWAG Impuls EMUs

5
 
 

A Mastodon thread by @q3k, who, together with @redford and @mrtick have reverse engineered the PLC code of NEWAG Impuls EMUs

6
 
 

from the “i'll drm your arse” and “industrial sabotage r us” department, a true scandal: a polish train manufacturer used firmware to lock out trains at 3rd party service depots in order to disrupt the operations of the trains for the railways who did not choose to service the trains at the manufacturer's; at the same time they blamed the 3rd parties for their inability to properly service the trains.

further reading in polish (but translates via google well): more technical and less technical, but with more political/economical details.

7
 
 

Bisschen nerdig, aber durchaus mit Bahnbezug und ziemlich spannend:

We (@redford, @mrtick and I) have reverse engineered the PLC code of NEWAG Impuls EMUs. These trains were locking up for arbitrary reasons after being serviced at third-party workshops.

Beim kommenden Chaos Communication Congress wird es dazu ebenfalls einen Talk geben und auch drüben bei HN wird fleißig diskutiert.

8
 
 

There is a discussion on Hacker News, but feel free to comment here as well.

view more: next ›