this post was submitted on 17 Sep 2023
346 points (99.1% liked)

Canada

7241 readers
252 users here now

What's going on Canada?



Related Communities


🍁 Meta


🗺️ Provinces / Territories


🏙️ Cities / Local Communities

Sorted alphabetically by city name.


🏒 SportsHockey

Football (NFL): incomplete

Football (CFL): incomplete

Baseball

Basketball

Soccer


💻 Schools / Universities

Sorted by province, then by total full-time enrolment.


💵 Finance, Shopping, Sales


🗣️ Politics


🍁 Social / Culture


Rules

Reminder that the rules for lemmy.ca also apply here. See the sidebar on the homepage: lemmy.ca


founded 4 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 9 points 1 year ago (1 children)

It's exactly the same. You're adding one 30-50A circuit to residential that will be used intermittently, and primarily during off peak hours. Very, very few vehicles will need a full charge every night, and the software on the charger side typically meters in current at much less than capacity if it's on a schedule, as the lower the current, the less heat, and less stress on the battery . Large charging stations are on par with commercial/light industrial, and we add that sort of load all the time.

I've worked for power utilities for 25 years on the generation side with some on the T&D side. The planners spend a pile of time on analysis to determine where additional load and/or sources are being added and triage based on that. When old stuff is scheduled for replacement, sometimes an upgrade is warranted, sometimes not, based on that analysis.

A lot of electrical equipment currently has long lead times. I've got quotes for up to 70 weeks on some stuff. It's been a side effect of relying on dodgy suppliers overseas. It has been improving.