this post was submitted on 24 Jun 2024
682 points (96.5% liked)

Technology

60039 readers
4755 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] afraid_of_zombies 1 points 5 months ago* (last edited 5 months ago) (1 children)

Imagine there is a process that makes a gas that is too hot. The solution is to spray the gas outlet with water. That's a quencher. The PLC controls the amount the water valve is open or rather how much to close it. If the PLC dies the valve should open up as much as possible and blast water. It is better to waste water instead of risking hot gas going through ducting systems that can't handle it.

My mistake was putting failed closed valves in the system. If there was a power outage or a dead PLC no water would have cooled the gas. And presumably the ducting would have melted and there would have been fires.

Like I said my most embarrassing mistake. At least we caught it before shipment.

[–] assassin_aragorn 2 points 5 months ago

It happens! The important part is review and learning from the mistakes.