this post was submitted on 29 May 2024
189 points (98.0% liked)
pics
19536 readers
541 users here now
Rules:
1.. Please mark original photos with [OC] in the title if you're the photographer
2..Pictures containing a politician from any country or planet are prohibited, this is a community voted on rule.
3.. Image must be a photograph, no AI or digital art.
4.. No NSFW/Cosplay/Spam/Trolling images.
5.. Be civil. No racism or bigotry.
Photo of the Week Rule(s):
1.. On Fridays, the most upvoted original, marked [OC], photo posted between Friday and Thursday will be the next week's banner and featured photo.
2.. The weekly photos will be saved for an end of the year run off.
Instance-wide rules always apply. https://mastodon.world/about
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
It's "needed" to increase throughput.
The current head station is a head station meaning it ends here and then they do a U-turn and go back different direction.
Also it's planned as a fully digital station which is supposed to increase the throughput as well as the trains can be dynamically throttled when enetering the station.
Current trackplan:
Stuttgart 21:
Planned changes on a map:
39 trains per hour with the old station is still more than 32 per hour with Stuttgart 21. Also groundwater, nature and referendum are totally meaningless words for anyone supporting this idea.
May be. I just thought the tour was interesting and wanted to share a bit what I was told.
But you aren't wrong with your position.
Don't get me wrong. I like the architecture too. Just trying to sneak in some facts.
Honestly it seems like a sensible change. If I'm not mistaken Frankfurt Hbf is also a head station and you lose a ton of time because of it.
If I remember our guide correct, the current max speed into the main station is 50kp/h max vs S21 being at 80kph.
Because it's planned as the first fully digital station (meaning only digital equipped trains can pass due to signaling) it should be able to not require full stops or similar.
At least what the guide told us seemed all logical and dainty but it still is taking a ton of time and money.
Those track diagrams look super cool