this post was submitted on 16 Apr 2024
1552 points (98.6% liked)

Comic Strips

14094 readers
3823 users here now

Comic Strips is a community for those who love comic stories.

The rules are simple:

Web of links

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] mkwt 6 points 10 months ago (2 children)

CDR time!

(except I've had CDRs that were scheduled for a full work week, 40 hours)

[–] [email protected] 15 points 10 months ago (2 children)

What is this CDR you speak of? Like blank CDs?

[–] ripcord 12 points 10 months ago (2 children)

Canada's Drag Race? Corel DRaw? Climate Data Record? Carbon Dioxide Removal??

Man, Carbon Dioxide Removal for a full week...

[–] [email protected] 9 points 10 months ago (1 children)
[–] [email protected] 4 points 10 months ago* (last edited 8 months ago)

That's the one I'm familiar with. But the slides themselves are super useful a few years later when you can't remember what in the world you were thinking.

[–] CarbonatedPastaSauce 6 points 10 months ago (1 children)

I looked it up. Commission on Dietetic Registration. Or possibly Colorado Department of Revenue. Or Chadron Municipal Airport (airport designation CDR) in Chadron, Nebraska.

Definitely one of those.

[–] ripcord 3 points 10 months ago* (last edited 10 months ago)

Ahhhhh, makes sense. Duh!

[–] mkwt 2 points 10 months ago (1 children)

Critical Design Review. In aerospace engineering, it happens when drawings and software are substantially complete, but before starting to cut metal. The goal is to provide some assurance that the design will actually comply with the system requirements.

CDRs are usually presented as a single PowerPoint deck that can run to thousands of slides, with many presenters and dozens of review panel members.

[–] [email protected] 1 points 10 months ago (1 children)

Interesting! I operate fully outside of the realm of aerospace engineering, so this is news to me. I take it this is an opportunity for anyone to speak up if they have any concerns with any aspect of the design before it moves to the production phase?

[–] mkwt 1 points 10 months ago
[–] apocalypticat 6 points 10 months ago

You had a 40-hour Colonoscopy Debris Removal procedure? Big ups to you!