this post was submitted on 29 Jan 2024
468 points (98.1% liked)

memes

9672 readers
2767 users here now

Community rules

1. Be civilNo trolling, bigotry or other insulting / annoying behaviour

2. No politicsThis is non-politics community. For political memes please go to [email protected]

3. No recent repostsCheck for reposts when posting a meme, you can only repost after 1 month

4. No botsNo bots without the express approval of the mods or the admins

5. No Spam/AdsNo advertisements or spam. This is an instance rule and the only way to live.

Sister communities

founded 1 year ago
MODERATORS
468
Badum tsk (feddit.ro)
submitted 7 months ago* (last edited 7 months ago) by [email protected] to c/memes
 
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 10 points 7 months ago (1 children)

Provided they can produce enough additional velocity to put the train on a ballistic arc through the next ring, it wouldn't need to go that fast. I imagine it would bounce slowly as it passed through each ring.

That is until there's a stiff crosswind and you're fired at hundreds of miles an hour into an powerfully electrified ring of solid steel. But that won't be a problem for you for long.

[–] [email protected] 9 points 7 months ago (1 children)

There's also no fail-safe condition. If there's a power failure or control system failure, things would go horribly wrong. Having the stations be the only safe resting point is a recipe for disaster regardless of how much redundancy is built into the systems.

[–] [email protected] 3 points 7 months ago (1 children)

Yes, I was just describing one of the many myriad issues with this design. It’s clearly not done by an engineer.

[–] [email protected] 5 points 7 months ago

It's basically a mag-lev train with extra steps. Extra being really, really dumb and pointless.