this post was submitted on 30 Jan 2025
429 points (99.3% liked)
Technology
61359 readers
4471 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each other!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
- Accounts 7 days and younger will have their posts automatically removed.
Approved Bots
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Never heard of that, interesting
https://en.m.wikipedia.org/wiki/Burn-in
Yeah, we did that at my last company to make sure our hardware was up to spec. We deployed an IOT device for long term outdoor installations, so it needed to survive very hot temps. We had a refrigerator we gutted and added heat to, and we'd run a simulation with heavier than expected load for a couple days and tossed/RMAd the bad units.
That was a literal burn in, but the same concept ak applies to pretty much everything. If you build/buy a PC, test the hardware (prime95 CPU test, memtest for RAM, etc). Put it through its paces to work out the major bugs before relying on it so you don't have to RMA a production system.