this post was submitted on 02 Nov 2024
149 points (98.1% liked)

Technology

60123 readers
4921 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] -2 points 1 month ago (4 children)

The key word is temporarily. How long ago was this?

Calling people dumb then throwing a weak argument doesn't make it stronger.

They're on wafer thin margins with vendor lock in. The strategy was not successful.

[–] KingRandomGuy 3 points 1 month ago

I think it's been about a year? IIRC Intel only started using TSMC for their processors with Meteor Lake, which was released in late 2023.

I believe their discrete GPUs have been manufactured at TSMC for longer than that, though.

[–] [email protected] 3 points 1 month ago

It was a bad take. Intel has not been using TSMC long.

That said, it's pretty broadly agreed that Intel needs to toss its manufacturing arm into a subsidiary, and then possibly make that subsidiary completely independent. That's what AMD did with Global Foundries, and it worked very well for them. This process seems to have already started at Intel.

[–] firadin 2 points 1 month ago (1 children)

How long do you think fabs take to build and upgrade? Intel was working on fixing 10nm for years, this isn't a software situation where turnaround times are measured in days or weeks. Going from tapeout to silicon for a single line is a 6 month process after the technology process is solidified, forget if you're doing it while trying to figure out yield problems.

[–] Entropywins 1 points 1 month ago

Three years in and at least one more to go where I work for our fab upgrade...could probably pull off new build in 4 or less not having to deal with production/cleanroom and depending on bldg/campus size.

[–] Entropywins 1 points 1 month ago* (last edited 1 month ago)

Ha wafer thin margins funny!!! Side note you ever watched them pull/crystallize silicone ingots it's pretty frickin cool to see.