northwest

joined 1 year ago
MODERATOR OF
 

Starting on Saturday, April 27, 2024, King George Station will be closed for approximately six weeks to complete essential maintenance work. During this time, there will be no SkyTrain service to or from King George Station. The Expo Line in Surrey will temporarily end at Surrey Central Station.

A full station closure is required to complete these important upgrades as efficiently and safely as possible. Some of the work will include removing parts of the rail to replace a turnout, a mechanical device that guides trains from one track to another. Over time, these components need replacement. This section of track has been in use since the station first opened 30 years ago.

Multiple infrastructure upgrades in and around King George Station are also scheduled; these include cable installations, elevator inspections, asset repairs, and station cleaning. The station is expected to reopen in mid-June.

Buses will continue serving King George Station during the closure, with some changes.

 

Expo Line service to Production Way–University will operate at 12-minute headways during this time. An additional service terminating at Braid will be implement.

Track reconfiguration work is being done to allow access to OMC4.

 
 
 
[–] [email protected] 6 points 1 year ago (1 children)

The passengers signed a waiver to confirm their knowledge that the submarine is an "experimental" vessel "that has not been approved or certified by any regulatory body, and could result in physical injury, disability, emotional trauma or death."

https://web.archive.org/web/20230619230915/https://www.bbc.com/news/world-us-canada-65934887

[–] [email protected] 3 points 1 year ago

I listen to clips of them on YouTube sometimes during the season. The Hockey Guy is my usual go to.

[–] [email protected] 3 points 1 year ago

Kenneth Chan still has Skyscraper Page to steal from.

view more: next ›