According to Practical Engineering, tracks are no longer given a gap. The gap causes premature wear and excess noise. Instead, they lay the track under tension, and weld the joins between sections.
There is still a limit on how much heat they can handle before buckling, of course. I just thought that was a neat innovation.
Basically, yes, though I think they have special hydraulic pullers, too. I forget the exact name. They have to take special measures if the day is too cold.
https://youtu.be/zqmOSMAtadc?si=FCG7HxiPWXNQY6Uj