this post was submitted on 12 Mar 2024
23 points (89.7% liked)

United States | News & Politics

1640 readers
74 users here now

Welcome to [email protected], where you can share and converse about the different things happening all over/about the United States.

If you’re interested in participating, please subscribe.

Rules

Be respectful and civil. No racism/bigotry/hateful speech.

Post anything related to the United States.

founded 2 years ago
MODERATORS
top 1 comments
sorted by: hot top controversial new old
[–] [email protected] 5 points 3 months ago

This is the best summary I could come up with:


From 2010, he worked as a quality manager at the North Charleston plant making the 787 Dreamliner, a state-of-the-art airliner used mainly on long-haul routes.

In 2019, Mr Barnett told the BBC that under-pressure workers had been deliberately fitting sub-standard parts to aircraft on the production line.

He said soon after starting work in South Carolina he had become concerned that the push to get new aircraft built meant the assembly process was rushed and safety was compromised, something the company denied.

He said in some cases, sub-standard parts had even been removed from scrap bins and fitted to planes that were being built to prevent delays on the production line.

This follows an incident in early January when an unused emergency exit door blew off a brand-new Boeing 737 Max shortly after take-off from Portland International Airport.

A preliminary report from the US National Transportation Safety Board suggested that four key bolts, designed to hold the door securely in place, were not fitted.


The original article contains 659 words, the summary contains 164 words. Saved 75%. I'm a bot and I'm open source!