this post was submitted on 02 Feb 2024
696 points (99.3% liked)
memes
10702 readers
4075 users here now
Community rules
1. Be civil
No trolling, bigotry or other insulting / annoying behaviour
2. No politics
This is non-politics community. For political memes please go to [email protected]
3. No recent reposts
Check for reposts when posting a meme, you can only repost after 1 month
4. No bots
No bots without the express approval of the mods or the admins
5. No Spam/Ads
No advertisements or spam. This is an instance rule and the only way to live.
Sister communities
- [email protected] : Star Trek memes, chat and shitposts
- [email protected] : Lemmy Shitposts, anything and everything goes.
- [email protected] : Linux themed memes
- [email protected] : for those who love comic stories.
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Power company asked if I wanted a three phase meter when I was checking power requirements for wiring my shop up.
I just needed a different meter.
Usually it's the meter and the cabling that needs changing, like an extra phase needs to be introduced but it should be available at street level if any commercial place is around.
Your shop might have had the cables already and just needed the meter change.