this post was submitted on 18 Nov 2023
154 points (97.5% liked)

ISO - Incredible Solutions Only

662 readers
1 users here now

Anything is possible if you are creative enough. Who needs ISO/OSHA/DIN standards or safety precautions?

founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] lemmyman 1 points 1 year ago (7 children)
[–] marcos 1 points 1 year ago (6 children)

So, with the ground grounded?

[–] lemmyman 4 points 1 year ago (5 children)

Yes, and with the neutral connected to ground at the service entrance

[–] Telecaster615 3 points 1 year ago (1 children)

Technically I believe it's ground and neutral are bonded at the "first point of disconnect"

If you have a disconnect switch outside after the meter that's the only point where ground and neutral are bonded together.

If you have no disconnect and the meter feeds directly to your main breaker panel ground and neutral are bonded in the main panel but not in any sub panels

[–] lemmyman 1 points 1 year ago

Very helpful clarification, thank you.

load more comments (3 replies)
load more comments (3 replies)
load more comments (3 replies)