this post was submitted on 18 Nov 2023
152 points (97.5% liked)

ISO - Incredible Solutions Only

634 readers
1 users here now

Anything is possible if you are creative enough. Who needs ISO/OSHA/DIN standards or safety precautions?

founded 10 months ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] lemmyman 1 points 10 months ago (7 children)
[–] marcos 1 points 10 months ago (6 children)

So, with the ground grounded?

[–] lemmyman 4 points 10 months ago (5 children)

Yes, and with the neutral connected to ground at the service entrance

[–] Telecaster615 3 points 10 months ago (1 children)

Technically I believe it's ground and neutral are bonded at the "first point of disconnect"

If you have a disconnect switch outside after the meter that's the only point where ground and neutral are bonded together.

If you have no disconnect and the meter feeds directly to your main breaker panel ground and neutral are bonded in the main panel but not in any sub panels

[–] lemmyman 1 points 10 months ago

Very helpful clarification, thank you.

load more comments (3 replies)
load more comments (3 replies)
load more comments (3 replies)