Technically I believe it's ground and neutral are bonded at the "first point of disconnect"
If you have a disconnect switch outside after the meter that's the only point where ground and neutral are bonded together.
If you have no disconnect and the meter feeds directly to your main breaker panel ground and neutral are bonded in the main panel but not in any sub panels
Very helpful clarification, thank you.