this post was submitted on 18 Nov 2023
154 points (97.5% liked)
ISO - Incredible Solutions Only
661 readers
1 users here now
Anything is possible if you are creative enough. Who needs ISO/OSHA/DIN standards or safety precautions?
founded 11 months ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Technically I believe it's ground and neutral are bonded at the "first point of disconnect"
If you have a disconnect switch outside after the meter that's the only point where ground and neutral are bonded together.
If you have no disconnect and the meter feeds directly to your main breaker panel ground and neutral are bonded in the main panel but not in any sub panels
Very helpful clarification, thank you.