this post was submitted on 09 Oct 2023
578 points (97.8% liked)

Technology

59703 readers
5399 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 3 points 1 year ago

So you can have things like electrical sockets with USB connections and you don’t have to have chips in the sockets, because typically they’re just dumb electrical interfaces.

If the supply is dumb and cannot negotiate power, then there is no need to negotiate power and it will fall back on regular 5V USB. The same if the load is dumb. In this case, there is no need for a cable chip.

It also means that the device delivering the power doesn’t have to be actually fully switched on, so you can recharge your phone from a USB port on your computer and you don’t have to power the computer on.

If the USB port has power to it, the computer is supplying it. The voltage would be on but open circuit. The computer would not have to supply the negotiation circuitry until a cable has been connected end to end and the voltage circuit is closed.

You're trying to present this as the cable replacing one of the devices, but it doesn't, it's an extra 3rd device in the negotiation. All 3 devices must permit a certain charging level for that level to be used. It may have some benefit in ensuring that cable load capacity isn't exceeded, but like I say it would be far better if the cables were reliably manufactured properly to handle the specified loads.