this post was submitted on 31 Jul 2023
188 points (91.6% liked)

Twitter

634 readers
1 users here now

An unofficial Twitter Community: The Good, the Bad and the Ugly!

Rules

  1. Be respectful and inclusive.
  2. No harassment, hate speech, or trolling.
  3. Engage in constructive discussions.
  4. Share relevant content.
  5. Follow guidelines and moderators' instructions.
  6. Use appropriate language and tone.
  7. Report violations.
  8. Foster a continuous learning environment.

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 16 points 1 year ago (5 children)

Wait a second.

How many days passed between "This is the new logo" and "giant 3D logo mounted atop the building"? And is it in any way feasible for design, manufacture, and installation to have occurred in such a short time?

I think not. Which only leaves one possibility: the logo and name change was fully planned well before Musk went on his weird "announcement" rant. And if that's true, it means that the hamfisted "WTF is Musk doing this time?" thing was on purpose.

[–] wildcardology 13 points 1 year ago (2 children)

Musk already owns x.com before/during his PayPal days. I wouldn't get it pass him if that logo was already built years ago.

[–] [email protected] 4 points 1 year ago

But the story was that Musk "stole" the logo from some rando who posted it in response to Musk's request for logos.

[–] LeadSoldier 1 points 1 year ago

It's been sitting in his garage for years. 🤣

[–] deranger 13 points 1 year ago (1 children)

It’s totally feasible, that’s just some shit bolted together in an X.

[–] wowbagger_ 4 points 1 year ago

Yeah I'm sure they just went to a sign company and said "here's what we want." A week is plenty of time for that

[–] pankkake 9 points 1 year ago

Yep, musk is using good ol' ragebait to get us to talk about his company. And it's working, look at us going.

[–] glimse 4 points 1 year ago

And is it in any way feasible for design, manufacture, and installation to have occurred in such a short time?

Definitely doable in a couple days. It's a rush job so they paid out the ass for it (good use of money for a struggling company) but it's a very simple shape so making it would not be hard

[–] Ddhuud 4 points 1 year ago

A day it's enough if it's a laser cutted and folded sheet metal + lights.