Hello all,
I have been tasked by the wife with putting up her new mailbox. It weighs in at a hefty 40 kgs. It came with a base plate with 4 holes to attach it to something on the bottom. I was going to make up a quick concrete slab but is a complete newb in that regard.
Please help;
Should I put some bolts in the concrete before it cures or should I drill the concrete after it's cured and put some bolts in then?
There is some existing concrete in the spot from the post of our previous mailbox, is it ok to just cover that over with the new concrete?
Will it be enough to just make a box shape with some scrap wood for the form or should I get something else?
Being a 40 kg monster, how thick should I make the slab?
Any other advice?
Thank you in advance!
Check if you can find some pavers that are the right size. It could make the job a lot easier for very little money. Just drill matching holes into the paver(s) and bolt in place.