this post was submitted on 23 Oct 2024
675 points (98.0% liked)

Housing Bubble 2: Return of the Ugly

323 readers
802 users here now

A community for discussing and documenting the second great housing bubble.

founded 6 months ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] chiliedogg 3 points 4 weeks ago (1 children)

Unless you're physically building it yourself, it's still gonna get corners cut at every stage.

Also, don't underestimate the drainage and erosion control engineering required for a home and a road. Those cookie cutter neighborhoods have regional drainage and detention. Your undeveloped land won't.

[–] [email protected] 1 points 4 weeks ago (1 children)

I'm sure with some research you could find a company willing to follow your specifications and instructions, but obviously that comes with cost.

To your second point, thanks for the heads up. There's plenty more research that I need to do before I worry about drainage, but I'll keep the thought in mind.

[–] chiliedogg 3 points 4 weeks ago

Septic and Drainage should come before any kind of detailed architecture. It'll save you 30 grand in Engineering revisions if you don't have to re-do the drainage plans.

Also, never let an architect be in charge of a project. It's like having the font designer be in charge of office software.