this post was submitted on 09 Aug 2024
910 points (99.5% liked)

Technology

58143 readers
4496 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] Grimy 65 points 1 month ago (3 children)

the report mentions operators are given work instructions that lack detail and require the operator to go diving through multiple levels of specifications and historical records to understand what to do

Damn, That's a red flag for anything that flies. I imagine their compliance checklists during assembly are a mess.

[–] bowser1035 35 points 1 month ago (1 children)

I work in automotive as an engineer and that would be a red flag in our industry too. Our safety standards are only a fraction as strict as aerospace for obvious reasons (we’re not shooting cars through the atmosphere at the speed of sound!), but we’d never get away with this with the amount of audits and accountability that we’re held to. This whole saga is absolutely insane.

[–] [email protected] 16 points 1 month ago (1 children)

And then there Tesla with masking tape, dish soap, and 2x4s lmao.

[–] [email protected] 5 points 1 month ago

Ah, but Tesla is really an AI company that happens to sell cars.

  • 🪄Musk as he waves away the auditors
[–] atomicorange 11 points 1 month ago

Hmm, space is a little different because so many products are one-offs. It’s hard to design checklists and detailed procedures when you’re making what are essentially prototypes each time. So you make more general processes and then your engineers apply them as needed to each unique build. It can end up looking like a bit of a mess. Space builds rely a lot on expert techs, good modular documentation, and multiple layers of engineering oversight because things change along the way and you can’t always plan for it.

I’m a process engineer at a different aerospace company. I standardize as much as I can and work hard to make instructions clear but man it’s a struggle. Boeing’s space group needs to pay people enough to retain good talent, because they’re all making decisions all day long.

[–] [email protected] 3 points 1 month ago

Bold assumption that someone has written good, comprehensive checklists. Sounds possible if not likely that they're underpaid and under supported too.