this post was submitted on 25 Jun 2024
4 points (83.3% liked)
Philippines
1607 readers
2 users here now
Mabuhay at maligayang pag-alis sa Lemmy! โ๏ธ
An abandoned community for the Philippines and all things Filipino! ๐ต๐ญ
Started out as a Reddit alternative during the blackout from Jun 12-21, 2023 with over 1k members in just a few days. Fizzled faster than the "I Didn't Do It" kid after a month until it became the internet's Centralia in less than a year.
Filipino artists whose works were featured on our daily random thread covers.
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
On first thought, it didn't seem that bad of an idea. Manufacturing and industry-based businesses in the western Rizal area (Montalban, San Mateo, Antipolo, Cainta, Taytay, Tanay, etc) needs access to the port of Manila. That then leads me to thinking there must have already been a plan for such a highway (like NLEX, SLEX, and C6).
However, the devil is in the details. Why would it need to be near the Pasig river? Couldn't they have adopted an existing alignment? Aurora Avenue comes to mind, but it's too narrow west of EDSA. An alignment based on Shaw Boulevard could have been nice, but it doesn't even reach Rizal, it'd have to cut through already-built-up area west of Manggahan floodway if it has hopes of reaching Manila East Road. So, Metro Manila is already too crowded for a major east-west corridor for transporting goods.
How about using the river itself! No, not a highway over the river, but using cargo barges to carry goods from Rizal perhaps via facilities in Tanay, Cainta/Taytay, Pasig, Makati, Manila and then a separate facility next to the port. And then if it works, it can be extended via a different route coming from Laguna. It's already there, and perhaps there wouldn't be any induced demand.
Of course, it would be hard to connect with the C6, NLEX, and SLEX projects, which might be the point all along. Also, there might be issues with how navigable Pasig river and Laguna de Bay would be to barges of a certain capacity.
I don't know, that's why things like this should have been planned by the government decades in advance, and with expert help from the likes of JICA and others, in light of future projections and policy.