this post was submitted on 08 Jun 2024
1201 points (98.3% liked)

memes

8584 readers
4096 users here now

Community rules

1. Be civilNo trolling, bigotry or other insulting / annoying behaviour

2. No politicsThis is non-politics community. For political memes please go to [email protected]

3. No recent repostsCheck for reposts when posting a meme, you can only repost after 1 month

4. No botsNo bots without the express approval of the mods or the admins

5. No Spam/AdsNo advertisements or spam. This is an instance rule and the only way to live.

Sister communities

founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 66 points 2 weeks ago (2 children)

The question is from project management certificate exam

[–] tristero 15 points 2 weeks ago

Mythical man month energy

[–] jj4211 12 points 2 weeks ago (2 children)

My kid showed me a test question from a junior high math test about construction a building in 12 months with x number of workers, how many workers do they need to hire if they want it done in 6 months.

So I guess if you answer that question "wrong" youd be smart, and if you answer it right, management. Even a junior high student mocked it...

[–] original2 4 points 2 weeks ago

I'm from the uk and they definitely shoe-horn in "real world" problems here too. In my A level exams we had to:

  • Find the volume of a vase with parametric volumes of revolution and de moivres theorum
  • Find the population of a bacterial colony with a second order decoupled differential equation
  • use polar integration to find the area of a porch

But there were also more pure questions which was good

[–] [email protected] 2 points 2 weeks ago* (last edited 2 weeks ago) (1 children)

Well, if T is total time to build, D is the time that can be distributed equally among any number of workers, and C is constant, indivisible time extra time that goes along with construction, and X is the number of workers, then:

T - C = D / X

so, since T is 12 and 6 is half of 12, then:

T/2 - C = D/X * 1/2

or

T/2 - C = D/2X where X > 0, C = 0, T=12, and D = (T - C) / X

which is both the answer it's looking for (twice as many workers) and the correct answer (it depends on at least two things we don't know), while assuming what they're assuming, which is C = 0

(Stupid ass junior high math problems piss me off, junior high is a traumatic experience)

[–] jj4211 2 points 2 weeks ago (1 children)

Well, arguably still "incorrect" in real world terms since it fails to have an adjustment for divisibility of D as a function of how many people. If theoretically a task is "perfectly divisible" at two people and halves the time, it will not be the case that a million people will cause it to happen in one millionth of the time. Improvement by expressly pointing out "C" and declaring your assumption of zero for math to work. Also assumption than for any increment of X, the time impact is equal.

In math this is pedantic, but it sure impact project planning in very disastrous ways, and business people love to assume C is zero, any change to X is linear and with linear impact, and make embarrassingly bad calls as a result.

[–] [email protected] 1 points 2 weeks ago* (last edited 2 weeks ago)

yup, but that answer was based entirely on the assumptions present in the question. D is all divisible work, and C is everything else, because that's literally all you can assume to make the math work. D has to therefore be 12 months worth of divisible work minus C. C could very well be 12 months of work, meaning D is zero and adding more workers won't matter.