this post was submitted on 14 Jun 2023
11 points (100.0% liked)

Portland

371 readers
1 users here now

founded 4 years ago
MODERATORS
 

The longest service interruption in TriMet's history is set to start Sunday, June 18. The public transit agency will halt MAX Red Line service between the Gateway Transit Center and Portland International Airport (PDX) for 126 days.

top 6 comments
sorted by: hot top controversial new old
[–] [email protected] 3 points 1 year ago

Wow, that's rough. The max is such a great way to get to and from the airport.

First I've heard about it too - thanks for sharing!

[–] [email protected] 2 points 1 year ago

Thank you for sharing. I have a friend coming into town for a conference in a couple of weeks and they were all told to take the red line to their hotel.

[–] [email protected] 1 points 1 year ago (1 children)

We rode through on Sunday and, yeah, looks like a big project. I'm still not 100% sure what they're trying to do. Looks like improving the arrival and departure tracks?

[–] [email protected] 2 points 1 year ago (2 children)

Looks like adding a second track:

add a second track to sections of the Red Line between the Gateway Transit Center and PDX, which TriMet says will improve system-wide reliability.

The timing seems questionable though. I'd think that any time other than our absolute peak travel season would have been better.

[–] [email protected] 1 points 1 year ago

It's part of a multi year long project, they may or may not have planned for that, but the timing of things can deviate from the schedule anyway where it's gonna be a risk

[–] [email protected] 1 points 1 year ago

Construction in the mud would probably take even longer though.