Well folks, it's time for the second launch of Starship version 2, as well as another booster RTLS and chopsticks catch attempt! Let's hope the ship fares better this time!
| Scheduled for (UTC) | 2025-03-03 23:45 | |
|
| | Scheduled for (local) | 2025-03-03 17:45 (CDT) | | Launch Window (UTC) | 2025-03-03 23:30 to 2025-03-04 00:30 (60 minutes) | | Launch site | Pad A, SpaceX Starbase, TX, USA. | | Booster | B15 | | Ship | S34 | | Booster landing | Chopsticks catch at Pad A or soft water landing in Gulf of Mexico | | Ship landing | Indian Ocean |
Webcasts
| Stream | Link | |
|
| | Space Affairs | https://www.youtube.com/watch?v=VTpZ9y4ZGiM | | Everyday Astronaut | https://www.youtube.com/watch?v=L_4gAtrfi6w | | Spaceflight Now | https://www.youtube.com/watch?v=Nw8Y4HU0du4 | | NASASpaceflight | Stakeout stream, Launch stream | | LabPadre | https://www.youtube.com/watch?v=Q2Fq4AJXoXk | | The Launch Pad | https://www.youtube.com/watch?v=xFpYVZfEzcI | | VideoFromSpace | https://www.youtube.com/watch?v=4dsTSWQ2MEA | | SpaceX | https://x.com/SpaceX/status/1896292787600908747 | | The Space Devs | |
Stats
Sourced from NextSpaceflight and r/SpaceX:
☑️ 2nd launch of Starship version 2
☑️ 2nd Starship Full Stack launch this year, 8th overall
☑️ 2nd launch from Pad A this year, 8th overall
☑️ 46 days, 0:53:00 turnaround for this pad
☑️ 28th SpaceX launch this year, 478th overall
Mission Details 🚀
-
SpaceX website (current). Highlights:
-
"flight will fly the same suborbital trajectory as previous missions and will target objectives not reached on the previous test"
-
"Starship will deploy four Starlink simulators, similar in size to next-generation Starlink satellites"
-
Another in-space raptor relight is planned
-
"A significant number of tiles have been removed from Starship to stress-test vulnerable areas across the vehicle."
-
"Multiple metallic tile options, including one with active cooling, will test alternative materials for protecting Starship during reentry."
-
"non-structural versions of Starship’s catch fittings are installed to test the fittings’ thermal performance"
-
"flight also includes the launch, return, and catch of the Super Heavy booster"
T-1 hour. Launch mount and tower are venting.